Scope of Work
• Civil Works:
• Site preparation
• Construction of concrete foundations
• Installation of structural supports
• Mechanical Installation:
• Installation of 125 MW Hitachi H25 gas turbine
• Installation of auxiliary systems and mechanical equipment
• Electrical Works:
• Cable laying and routing
• Installation of switchgear
• Connection of transformers
• Instrumentation and Control:
• Installation of instrumentation and control systems
• Piping Works:
• Fuel piping installation
• Cooling system piping
• Lubrication system piping
• Compressed air piping
• Safety and Quality Assurance:
• Execution under strict safety standards
• Compliance with quality requirements to ensure full integration and readiness for commissioning