Scope of Work
• Project Scope:
• Design, procurement, and construction of prefabricated steel modular buildings
• Buildings to serve as the Local Control Room (LCR) for the DS7 Water Injection System upgrade
• Design Works:
• Architectural and structural design
• Electrical and mechanical (HVAC) systems design
• Fire protection system design
• Procurement:
• Prefabricated steel structures
• Electrical equipment and systems
• HVAC units and components
• Fire-fighting systems and safety equipment
• Construction and Installation:
• Civil works and foundation preparation
• Assembly of steel modular structures
• Electrical system installation
• HVAC installation and commissioning
• Fire-fighting system implementation
• Standards and Compliance:
• Execution to high-quality standards
• Ensuring safety and full operational readiness



