Scope of Work
• Design and Engineering:
• Complete design of four 33kV/11kV electrical substations
• Detailed engineering for equipment layout and cable routing
• Design of structural supports and electrical components
• Procurement and Installation:
• Procurement and installation of all major electrical systems
• Installation of emergency diesel generators
• Installation of high-voltage (HV) and low-voltage (LV) switchboards
• Installation of motor control centers (MCCs)
• Installation of transformers and gas-insulated switchgear (GIS)
• Installation of capacitor banks, UPS units, and battery systems
• Cabling Works:
• Laying and termination of over 1.5 million meters of electrical cables
• Systems Integration:
• Setup of integrated communication systems
• Installation of fire alarm systems
• Project Purpose:
• Delivery of critical power infrastructure to support industrial operations in Iraq for Samsung